Mumbai Darshan I
Construction site: muddy water logged in, make shift swimming pool for the slum children
Slum Tabela
Half constructed bridge, will ease traffic when (???) completed
Same bridge from the other side
Wide road constructed (between the two roads where the traffic is moving), entry still not done
Huge water/sewage pipes running through slums
Another half constructed road-widening project
After completion of this this flyover , ppl will save atleast 4-5 kms or 15-30 mins, the entire structure is ready, entry and exit yet not done
Same flyover near SEEPZ
Pre constructed concrete slabs, ready to be put to use (god only knows wen…)
More slums
Regretting - MUTP or us?
nice observations...
Posted by dawg | 12:02 PM, May 24, 2006
Was a little disappointed from the pictures. These are the things that people always see or want to see in our day to day lives. I just wished u had found something optimistic about the road that u took.
sorry, but i wrote what i felt.
Posted by Anonymous | 2:58 PM, May 24, 2006
@ neeraj
point well taken
i've been trying to do the same for the last one year, but i think that strech of road is as untouched as it was last year.
also i dont think ppl have enough time to think abt issues, like the one in the 1st pic.
BTW my next instalment is a contrast to this one, where work has been done and it shows
my pune trip also featuring Mumbai pune expressway, which is an experience in its own
and mumbai darshan 2 featuring the mumbai skyline @ nariman point (again a man made marvel) and the breathtaking views arnd the area
Posted by zxcv | 3:13 PM, May 24, 2006